Installation of doors.
How to properly install the door.
1. Pre-metering level floor space, properly expose the jamb into the opening.
2. Derive the doorway by two parameters width and height - in the size of a door unit. At the same time to fill the sealant between the frame and opening retained technological gap from 10 mm to 20 mm on each side.
3. The door frame is exposed on the level of adjustment in two planes (from the leaf and from the porch), the top box should have a horizon. (Note: For proper installation of the doors need a plumb or professional level). For the convenience of billing box she wedging wedge-shaped bars. After setting the box on the level necessary to Gaugeable distance between the posts at the top and bottom of the box, so that gaps between the door and stand boxes were uniform, they should be not more than 3,0 - 3,5 mm.
4. After installing the seal in the box, is counting on kickoff and loops. Kickoff is a special cutter or chisels to the depth of the thickness of the loop. (Note: hollow under the loop on the box and door leaf shall be uniform in order to avoid skewing the loops). Hinges bolted hiding a screw, the leg loops smeared graphite grease or engine oil.
5. Mounting boxes to the slope is usually carried out anchor bolts, which allows you to adjust the rack vertically. The space between the box and the slope is filled with polyurethane foam for better sound and thermal insulation. (Note: To avoid damage, pre-glued carton masking tape). Holes in the door frame of the anchor bolt closed with a decorative cap.
6. Trim miter box cut my throat at an angle of 45 degrees and attached to the door frame hidden nail or liquid nails, if necessary, mount the extender boxes (Additionally gathered panel).
No comments:
Post a Comment